Tunnel Construction |
AIR provides the following codes for tunnel construction:
While Coverage C (content) is not supported for most of the 200-series construction class codes, it is, supported for Inland Transit (construction code 259) and for some other construction codes, such as tanks and pipelines. For the full list of supported combinations, refer to the "Const. & Occ. Combin." tab in each model supplement. |
Construction Code |
|
|
Alluvium Tunnels |
Tunnels that were drilled through unconsolidated sedimentary deposits and then typically lined with concrete For exposures in South America, use 2131. |
|
Rock Tunnels |
Rock tunnels are lined or unlined tunnels that were drilled through rock. For exposures in South America, use 2141. |
|
Cut and Cover Tunnels |
Tunnels that were constructed by cutting a trench, installing a liner, and then covering the liner with earth |
|
Alluvium Tunnels |
Lined or unlined alluvium tunnels with unknown method of construction Valid for South America and Southeast Asia, Mainland China, and the United States. Also valid for AIR Earthquake Model for New Zealand. |
|
Alluvial Bored Tunnels |
Lined or unlined tunnels constructed through alluvium soil using a boring machine Valid for South America and Southeast Asia, Mainland China, and the United States. Also valid for AIR Earthquake Model for New Zealand. |
|
Rock Tunnels |
Lined or unlined rock tunnels with unknown method of construction Valid for South America and Southeast Asia, Mainland China, and the United States.v |
|
Rock Bored Tunnels |
Lined or unlined tunnels drilled through rock using a boring machine Valid for South America and Southeast Asia, Mainland China, and the United States. Also valid for AIR Earthquake Model for New Zealand. |
|
Unknown Tunnel |
Lined or unlined tunnels with unknown material and unknown method of construction, or other tunnels that cannot be mapped to any of the other tunnel construction class codes Valid for South America and Southeast Asia, Mainland China, and the United States. Also valid for AIR Earthquake Model for New Zealand. |
|
Rock Cut and Cover Tunnels |
Lined or unlined rock tunnels constructed after excavating a trench and roofing over with an overhead support system Valid for South America and Southeast Asia, Mainland China, and the United States. Also valid for AIR Earthquake Model for New Zealand. |
|
Alluvial Cut and Cover Tunnels |
Lined or unlined alluvium tunnels constructed after excavating a trench and roofing over with an overhead support system Valid for South America and Southeast Asia, Mainland China, and the United States. Also valid for AIR Earthquake Model for New Zealand. |
© 2020 AIR Worldwide. All rights reserved. Touchstone 7.0 Updated September 03, 2020 |