Known Issue 446
Surplus share treaties cannot have multiple risk-level attachments and limits for the same contract/layer/location.
Issue ID | 446 |
Summary | Surplus share treaties cannot have multiple risk-level attachments and limits for the same contract/layer/location. |
Description | Surplus share treaties cover one or multiple risks. For each of these, risk-level terms can be defined. Starting with Touchstone 11.0 only one set of terms can be defined per individual risk. |
Resolved in | Future Verisk Synergy Studio release |
Date posted | 8/13/2025 |
Software versions affected | 13.0, 12.0, 11.5, 11.0 |
Feature set | Detailed loss |
Models | |
Potential for loss numbers impact | Yes |
Workaround | The user can replicate the same structure by creating multiple surplus share treaties instead of a single one. |