Guidelines to Specifying the Number of Cores

The table lists the factory-defined resource allocation scalability rules for various activity types. The table only includes activity types that are configurable in the Administration Console via the HPC Resource Management function.

This is a key to the table columns.

Activity Type Code

The code in the ActivityType table in the AIRReference database

Activity Type

The activity types that you can select from the list in the HPC Node Group Association pane

Cores

The minimum and maximum number of cores that can be assigned to each activity type

       1 means that the activity type can use only one core. Assigning more cores would not have any effect because the activity type’s internal service is limited to using one core.

       1 - N means that the activity type can be distributed on an unlimited number of cores, although there may be diminishing returns beyond a certain point. For some activity types, AIR includes a recommendation regarding the number of cores.

 

Activity Type Code Activity Type Description Cores
ARP Associate result to project Associate result or results in portable result database to project 1
CATLOSS CAT Loss Treaty Stand-alone catastrophe loss  treaty (CATXOL analytics) 1

CLSH

Clash Analysis

A type of analysis that alerts users to potential underwriting clashes (multiple policies in a small geographic area)

1 N

DBEXPORT

Export to database

Export analysis results or exposure data into an existing or new database

1

DELETE

Delete

Delete activity

1

DEXPORT

Exposure Export to CSV

Data Export Activity

1 – N

DQ Data Quality Analysis Top-level Data Quality Analysis service 1 – N
If you run Data Quality Analysis with all types, the maximum number of cores is 28.
DQ_AMB Rating Agency Data Quality Analysis Rating Agency Reports (A.M. Best) 1
DQ_AUG Augmentation Data Quality Analysis Augmentation Report

1 – 12

Internally this is limited to a maximum of 12 cores.

DQ_DVA Validation Data Quality Analysis Validation Report

1 – 12

Internally this is limited to a maximum of 12 cores.

DQ_IDB Benchmark

Data Quality Analysis Industry Benchmark Report

1

DQ_IDR Industry Exposure

Data Quality Analysis Industry Exposure Report

1

DQ_RPT Data Quality Analysis Reports

Data Quality Analysis PDF Reports

1

DQ_SCR Scoring

Data Quality Analysis Scoring Report

1

DS_ATC Database Attach

Attach database

1

DS_CRT Database Create

Create current version of exposure or result database

1

DS_DLT Database Delete

Delete database

1

DS_DTC Database Detach

Detach database

1

DS_REG Database Register

Register Database

1

DS_UPG Database Upgrade

Upgrade database is in progress

1 – N

Recommended: 2 cores for exposure databases

EC Geospatial

Geospatial activity

1 – N

EXPS Exposure Summary

Exposure summary analysis

1

HAZ Hazard Analysis

 

1 – N

IMPACT Impact Analysis

Marginal and portfolio impact

1

IMPORT Import

All import functions

1 – N

Recommended: 4 cores

Depending on the Import type you select, you may see performance improvements when you increase the maximum number of cores to 16.

LEXPORT Company Loss File (CLF) Export

Loss Export to Create CLF & ALF Files

1

LGRP Detailed Loss Group

Detailed loss group

1

LOSS Detailed Loss

Detailed loss analysis

1 – N

LOSS_MOD Modified Detailed Loss

Applying loss modifications to calculated ground-up losses

1 – N

LTEXP Loss Cost Templates Export

Exporting loss cost templates

1

LTIMP Loss Cost Templates Import

Importing loss cost templates

1

REGEO Geocode

Geocodes

1 – N

REXPORT Results Export to CSV

Results Export Activity

1 – N

SHP_IMPORT GIS Shape File Import

Importing Shape files into database for GIS

1

UW_RPT Underwriting Report

Underwriting report generation

1

 

 


© 2020 AIR Worldwide. All rights reserved.

Touchstone 7.0 Updated September 03, 2020