Contract Details

The following table details the fields and tabs in the Contract Details pane:

Field or Tab

Description

Contract ID

Unique, required, user-defined contract identifier

Contract Type

One of the following contract types:

       Primary Property

       Facultative Property

       Primary Workers' Compensation

       Facultative Workers' Compensation

Status

One of the following contract submission statuses:

       Bound

       Cancelled

       Expired

       Quoted

       Rejected

       Renewal

       Submitted

Inception Date

Date of the first day on which coverage is effective

 

When importing data, use one of the following formats and select this format in the Options tab of AIR ImportExpress:

       MM/DD/YYYY

       DD/MM/YYYY

       YYYYMMDD

       YYYY-MM-DD

  If you specify valid location-level inception and expiration dates for a location, and these dates are different from (that is, a subset of) the inception and expiration dates for the corresponding contract, Touchstone considers only the location-level inception and expiration dates for this location when performing a Detailed Loss Analysis.

For inception and expiration dates, and other in-force dates, you must specify a date value between 01/01/1970 and 12/31/2038, inclusive, for dates based on US regional settings. If you are not using US regional settings, use a date value other than 01/01/1970, such as 01/01/1990.

Expiration Date

Date of the last day on which coverage is effective

 

When importing data, use one of the following formats and select this format in the Options tab of AIR ImportExpress:

       MM/DD/YYYY

       DD/MM/YYYY

       YYYYMMDD

       YYYY-MM-DD

  If you specify valid location-level inception and expiration dates for a location, and these dates are different from (that is, a subset of) the inception and expiration dates for the corresponding contract, Touchstone considers only the location-level inception and expiration dates for this location when performing a Detailed Loss Analysis.

For inception and expiration dates, and other in-force dates, you must specify a date value between 01/01/1970 and 12/31/2038, inclusive, for dates based on US regional settings. If you are not using US regional settings, use a date value other than 01/01/1970, such as 01/01/1990.

Insured Name

Name of the insured party

Line of Business

User-specified line of business

Underwriter

Name of the underwriter

Producer

Name of the producer

Currency

Base currency for this contract

 

For analysis at the contract level, Touchstone converts all locations to this base currency.

 

See the list of valid currency codes.

Perils

Perils insured under this contract

 

See the list of valid peril codes.

  To specify multiple perils in a single entry within an import file, separate the corresponding peril codes with a Plus (+) symbol, such as, PWH+PES).

Policy Form

User defined policy form assigned to this contract

Locations

Locations associated with this contract

Layers

Layers associated with this contract

Step Function

Step function associated with this contract

 

 


© 2020 AIR Worldwide. All rights reserved.

Touchstone 7.0 Updated September 03, 2020