Configuring Non Catastrophe Peril Analyses |
This topic lists the basic tasks you perform to configure and run a non-catastrophe peril analysis.
• Creating a new non-catastrophe peril analysis
• Specifying analysis settings, such as selecting the method for calculating ground-up losses, the loss cost adjustment factor, and the public protection class
• Applying reinsurance programs
• Specifying output options, such as the loss perspectives and non-catastrophe details
• Specifying analysis management settings, such as currency and rate, as well as analysis priority and scheduling
© 2020 AIR Worldwide. All rights reserved. Touchstone 7.0 Updated September 03, 2020 |